Turbine and recuperator
A 2 MW-class industrial gas turbine in a 40 ft container: single shaft, dry low-emission combustion, a 480 V generator. The ACTE recuperator rides on a skid on the roof, with the heat recovery and the stack.
Firm on-site power for AI where the grid cannot connect on time. One 2 MW-class industrial gas turbine with an ACTE recuperator, a battery and exhaust-driven cooling, in four containers and a gas skid. It powers and cools 8 liquid-cooled AI racks or one NVIDIA DSX POD, with no grid connection.

Design targets per block, natural gas, sea level; the recuperated version will be validated on the pilot block.
to connect to the grid in the primary data-center markets
JLL, Jan 2026for small off-the-shelf gas turbines
EPRI, Mar 2026short in US data centers in 2027 and 2028, even counting 19 GW of on-site gas generation
Morgan Stanley, Sep 2026The chips exist; power on a date does not. A block that switches on in days or months, instead of years, puts waiting racks to work.
Each module does one job and travels as standard ISO freight. The whole block sits on a site of about 23 × 18 m.


A 2 MW-class industrial gas turbine in a 40 ft container: single shaft, dry low-emission combustion, a 480 V generator. The ACTE recuperator rides on a skid on the roof, with the heat recovery and the stack.

Eight liquid-cooled AI racks, the network rack mid-row and three coolant distribution units, one of them a spare. A V-type dry cooler covers the roof.
A 480 V switchboard with A and B buses, a 1.4 MW grid-forming converter and an LFP battery in its own fire-rated room. The battery absorbs rack load steps, starts the turbine and carries the block for ~7 minutes on a trip.

A 20 ft container with a lithium-bromide absorption chiller that runs on exhaust heat, its pumps, and a cooling tower on the roof.
Gas skid: metering, regulation, filter, shutoff and a compressor that lifts distribution-main gas to the turbine’s 13 barg. A transmission pipeline already has that pressure.
~1,630 kW at 15 °C and ~1,460 kW at 25 °C, after a 3% margin; 1,679 kW gross at ISO conditions.
Above ~30 °C, exhaust heat cools the air the turbine draws in.
8 liquid-cooled racks of 140 kW (GB300-class NVL72): 1.12 MW, held to 45 °C. Or one NVIDIA DSX POD of 7 Vera Rubin NVL72 racks: 1.26 MW, continuous to 40 °C and to 45 °C in dry climates.
Returned to the cycle: electrical efficiency rises from ~23% to ~33%, about 30% less gas per kWh.
1,008 kW: water at 45 °C into the rack, a V-type dry cooler, only fans and pumps.
Chilled water from a 352 kW chiller: 137 kW on a mild day, 333 kW at 45 °C, including turbine-intake cooling.
Available as hot water or steam for a neighbor (cogeneration).
36–42% counting the cooling made from exhaust heat; up to ~80% with cogeneration.
For 1,120 kW of IT. A grid-connected data center at a PUE of 1.3 would spend ~336 kW.
LFP. Absorbs rack load steps of up to ~340 kW within milliseconds, starts the turbine with no grid and rides through ~7 minutes on a trip.
Pipeline natural gas. Hydrogen blends: see Fuels below.
Including the maintenance areas, on level concrete pads.
Design targets per block, natural gas, sea level; the recuperated version will be validated on the pilot block.

Rack heat takes a separate path: ~90% of it leaves in water at ~55 °C, and the dry cooler sends it to the air with fans and pumps only.
About the ACTE recuperator →Design targets per block, natural gas, sea level; the recuperated version will be validated on the pilot block.

The NVIDIA DSX POD is a complete inference factory: 7 Vera Rubin NVL72 racks and 504 GPUs, integrated and validated before delivery, installing in as little as 14 days on a prepared site (NVIDIA, 21 Oct 2026).
The block is designed to power it at its door, at 800 VDC, the pod’s own input: 1.26 MW of racks, continuous to 40 °C and to 45 °C in dry climates. Each pair runs on its own, and a site grows one pod at a time.
NVIDIA, DSX POD, Vera Rubin and NVL72 are trademarks of NVIDIA Corporation.

1 GW of IT is about 890 identical blocks: the same drawings and the same factory test, repeated. Blocks group in small pools at metro sites with fiber and in larger clusters in the gas basins.
From stock to switch-on, on a ready site: gas connected, air permit issued, pad in place.
For new orders, built and hot-tested at the factory.
Indicative · stock confirmed at order.
From a transmission pipeline or a distribution main; the gas skid brings it to the turbine’s pressure.
In development — already accepting up to 30% hydrogen blended with natural gas.
Send the site address, the gas line, the fiber and the rack or pod delivery date. We reply with the site’s power path and a delivery date.
Talk to Bluen